Our Experience

  • Project No: 55497 Design Review and Approval of Lifting Trunnion & Tailing Lug of Buffer Tank T-50101
    PETROSERV
    Qatar
    2017
  • Project No: PO/17-002 Third Party Design Review & Approval of Mechanical, Structural & Thermal Calculations, Drawings, Insulation Roof & Shell Design, PQR/WPS and Bridger Platform of TES Tank (Qty.01) as per AWWA D100
    TANKLINE
    Abu Dhabi, UAE
    2017
  • SIL (Safety Integrity Level) Study for Three Boilers and Boiler House.
    GSK
    Pakistan
    2017
  • RBI Implementation Project with Provision of Software and Associated Services
    Groupement Berkine SH/AAC
    Algeria
    2017
  • Project No: 9500091537 Lifting lug with pad & Tailing lug Calculation Review.
    Qatar Petroleum
    Qatar
    2017
  • Integrity Inspection of Natural Gas System Piping for D, E, G, K & H Stations Dubai Electricity and Water Authority (DEWA)
    Dubai Electricity and Water Authority (DEWA)
    United Arab Emirates UAE
    2017
  • Project No: JR-000613-2017 Certification of Structural Calculation for Aluminium Canopy Structure
    Alba Tower Aluminum
    United Arab Emirates UAE
    2017
  • Risk Based Inspection (RBI) program implementation
    BRUNEI METHANOL COMPANY (BMC)
    Brunei
    2017
  • Project No: 9500075879 Lifting Procedure, Lifting Calculation and Lifting Arrangement Drawing Review
    Qatar Petroleum
    Qatar
    2017
  • Project No: 90000281153 Structural Assessment of National Emergency Center
    Musanada
    United Arab Emirates UAE
    2017
  • Provision Of Fitness For Services (FFS) Assessment Of Pipeline For Petronas Carigali Sdn Bhd- Sabah Operations
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: TES/8695-Rev-1 Third Party Design Review & Approval Of Mechanical, Structural & Thermal Calculations And Drawings Of Tes Tank (Item# Tes-01) As Per Awwa D100
    TANKLINE
    Abu Dhabi, UAE
    2016
  • Risk Based Inspection (RBI) at Jazan Refinery & Terminal Project for Hyundai Arabia Limited
    Hyundai Arabia Limited
    Saudi Arabia
    2016
  • Project No: 9500057958 Design documents review for Lifting calculation, lifting drawing
    Qatar Petroleum
    Qatar
    2016
  • QRA Study as part of Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study for BeAAT Expansion Project – Project No. 5649
    Abu Dhabi National Oil Company (ADNOC) Refining
    United Arab Emirates UAE
    2016
  • Order No. 3620292876 Pipeline Engineering Consultancy PL196 Fitness for Services (FFS ) as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: GBEP/1307 Design Review of Basket Structures (4 nos.)
    Green Bridge Engineering
    Abu Dhabi, UAE
    2016
  • Conduct Risk Based Inspection at Manifa Producing Facilities (MPD) for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2016
  • Project No: AS-M141-P44500-R1 Design validation of Detail Engineering Documents As A Engineering Subcontractor For additional Outfall Pipeline & Interconnecting Piping for Ruwais refinery (East)
    Dhafir Technologies LLC.
    Abu Dhabi, UAE
    2016
  • Provision of Third Party Approval for All Three Stages of NG/SNG Pipe work for Residential Tower Plot No C30-C31, RS3, Reem Island, Abu Dhabi
    Universal Consultancy Services
    Abu Dhabi, UAE
    2016
  • Order No. 3620287133 PL202 Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016