Our Experience

  • SIMOPS Study for EPC Works Modification and Strengthening of HABSHAN PIPERACKS PHASE-3
    Granite Construction Company
    UAE
    2019
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019
  • Risk Based Inspection of stationery equipment at Sui Field Location
    Pakistan Petroleum Limited (PPL)
    Pakistan
    2018
  • Project No: PO/18-003-005 Third Party Design Review & Verification of Mechanical and Structural Design Calculations and GA drawing only for One Design of TES Tank as per AWWA D100
    TS Tank Contracting L.L.C
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG / SNG Pipework Installation at Residential Building Plot C28, Sector E_48, Abu Dhabi
    BEAD Architects
    Abu Dhabi, UAE
    2018
  • Project No: T3122 Design Review and Verification for Auxiliary Structure of V7841 & V9133.
    TECNIMONT
    Italy
    2018
  • Risk Based Inspection (RBI) Program Implementation
    BRUNEI METHANOL COMPANY (BMC)
    Brunei
    2018
  • Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA – Project No.5643
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Mixed used Building On Plot No. 28, Sector No. RBW-2, Al Raha Beach, Abu Dhabi.
    BEAD Architects
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Approval of Conceptual DESIGN STAGE of NG Pipe Work at Plot 11, sector RBW-2, Al-Raha, Abu Dhabi
    MAKAN Consulting
    Abu Dhabi, UAE
    2018
  • Corrosion Management Program & RBI Study (Project 6285) for Fabrication And Installation Of (Sfny, Zulf And Brri) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
    National Petroleum Construction Company (NPCC)
    United Arab Emirates UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG and SNG Pipework Installation at Residential Building, Sector RBW-7, Plot C-10, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018
  • Variation Order for Consultancy Services for HSE & Fire Quantitative Risk Assessment Study at Dukhan Fields
    Qatar Petroleum
    Qatar
    2018
  • Provision Of Third Party Review & Verification For Conceptual Design Stage of NG and SNG Pipework Installation At Residential Building, Plot No. 8, Rbw-2, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018
  • Provision for Generation of Design Calculations & Drawings of One Demo Pressure Vessel For Alteration Job As Per ASME Section VIII DIV. 1 ED. 2017 and to Present Design Engineer During Audit.
    GASCO Abu Dhabi Gas Industries Ltd
    Abu Dhabi, UAE
    2018
  • Project No: AS-M141-P53545 Agency for Verifying Pump NPSH Calculation Construction of Additional Outfall for Ruwais Refinery (East)
    Dhafir Technologies LLC
    Abu Dhabi, UAE
    2018
  • Dynamic Stress analysis for gas piping to evaluate vibration fatigue as a part of Vibration Risk Assessment of Dragon Oil Onshore (CPSF) and Offshore Production Assets (LAM-28 and LAM-A)Turkmenistan
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2018
  • Project No: 8300007767/601 Provision of Design Verification To Verify Material Grade Changes of Evaporator Tubes In Which The Existing Material of SA-178 Gr. A is Replaced With Available Material of SA-178 Gr. C.
    Bilfinger Deutsche Babcock Emirates LLC
    Abu Dhabi, UAE
    2018
  • Decommissioning Environmental Management Plan (DEMP) Preparation of DEMP in accordance with EAD’s Technical Guidance Document for Decommissioning Environmental Management Plan (DEMP).
    National Marine Dredging Company (NMDC)
    Abu Dhabi, UAE
    2018