RBI Implementation for LAM-10, LAM-75, ZHD-21 & ZHD-60 Offshore Platforms.

Date
October 28, 2022
Our Role
Awarded

Velosi has been appointed by Dragon Oil (DOTL) to perform RBI Study for topside equipment and piping, pipelines & structures for offshore platforms LAM-10, LAM-75, ZHD-21 & ZHD-60 in the Caspian Sea (TR 1907) by utilizing VAIL-Plantยฎ software in DOTL Plants in Turkmenistan.

Velosi team will carry out the Risk-Based Inspection (RBI) study within LAM-10, LAM-75, ZHD-21 & ZHD-60 platforms of DOTL by adopting a semi-quantitative RBI approach and utilizing VAIL Plant Software (PEMS, PIMS & SIMS module). The RBI methodology for this project will be based on API RP 581.

๐“๐ž๐š๐ฆ ๐•๐ž๐ฅ๐จ๐ฌ๐ข ๐ฐ๐ข๐ฅ๐ฅ ๐œ๐จ๐ฆ๐ฉ๐ฅ๐ž๐ญ๐ž ๐ญ๐ก๐ž ๐ฉ๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐›๐ฒ ๐ž๐ฑ๐ž๐œ๐ฎ๐ญ๐ข๐ง๐  ๐ญ๐ก๐ž ๐Ÿ๐จ๐ฅ๐ฅ๐จ๐ฐ๐ข๐ง๐  ๐๐ž๐ฅ๐ข๐ฏ๐ž๐ซ๐š๐›๐ฅ๐ž๐ฌ:

  • Corrosion Loop Drawings (PFDs and P&IDs) – Equipment & Piping
  • Section Division Drawings โ€“ Pipeline
  • Tag Marked Drawings โ€“ Structure
  • Asset Registers
  • Corrosion Rates and Remnant Life
  • Corrosion Inspection Strategy Manual
  • Risk Ranking Assessment
  • List of Critical Assets
  • PIR Criteria
  • Inspection Plan
  • Inspection Drawings
  • IOWโ€™s
  • Asset Passports
  • RBI Study Report

๐•๐€๐ˆ๐‹-๐๐ฅ๐š๐ง๐ญ ๐’๐จ๐Ÿ๐ญ๐ฐ๐š๐ซ๐ž ๐Œ๐จ๐๐ฎ๐ฅ๐ž๐ฌ:

  • PEMS โ€“ Pressurized Equipment Management System
  • PIMS โ€“ Pipeline Integrity Management System
  • SIMS โ€“ Structure Integrity Management System